Action selection in risk assessment with fuzzy Fine-Kinney-based AHP-TOPSIS approach: a case study in gas plant

dc.authoridOturakci, Murat/0000-0001-5946-3964
dc.contributor.authorDogan, Bahar
dc.contributor.authorOturakci, Murat
dc.contributor.authorDagsuyu, Cansu
dc.date.accessioned2025-01-06T17:37:53Z
dc.date.available2025-01-06T17:37:53Z
dc.date.issued2022
dc.description.abstractIn this study, the hazards occurring in a medium-sized gas filling facility were defined, and the risk scores of these hazards were determined by the expert team according to the Fine-Kinney risk analysis method. However, since the same risk significance score is obtained in different combinations of scale values in the classical Fine-Kinney risk analysis method and the characteristics/constraints of the company applied in the risk analysis are not taken into account, the hazards were evaluated using fuzzy Fine-Kinney risk analysis, and the most critical hazards were determined. Action plans are defined for critical hazards determined as a result of fuzzy Fine-Kinney risk analysis. Among the actions that require company resources, the action selection was performed with the TOPSIS method, taking into account their relationship with the hazards by integrating the weights, which was calculated with the AHP method, of affected groups. The effect of operating constraints is included in the last step of the study to calculate the final weights. Calculating the results by including the risk-affected groups and company constraints and ranking the actions reveals that the study is an original, objective, and applicable study.
dc.identifier.doi10.1007/s11356-022-20498-2
dc.identifier.endpage66234
dc.identifier.issn0944-1344
dc.identifier.issn1614-7499
dc.identifier.issue44
dc.identifier.pmid35499730
dc.identifier.scopus2-s2.0-85129282918
dc.identifier.scopusqualityQ1
dc.identifier.startpage66222
dc.identifier.urihttps://doi.org/10.1007/s11356-022-20498-2
dc.identifier.urihttps://hdl.handle.net/20.500.14669/2406
dc.identifier.volume29
dc.identifier.wosWOS:000789781800003
dc.identifier.wosqualityQ1
dc.indekslendigikaynakWeb of Science
dc.indekslendigikaynakScopus
dc.indekslendigikaynakPubMed
dc.language.isoen
dc.publisherSpringer Heidelberg
dc.relation.ispartofEnvironmental Science and Pollution Research
dc.relation.publicationcategoryMakale - Uluslararası Hakemli Dergi - Kurum Öğretim Elemanı
dc.rightsinfo:eu-repo/semantics/openAccess
dc.snmzKA_20241211
dc.subjectFine-Kinney method
dc.subjectFuzzy
dc.subjectAHP
dc.subjectTOPSIS
dc.subjectAction selection
dc.titleAction selection in risk assessment with fuzzy Fine-Kinney-based AHP-TOPSIS approach: a case study in gas plant
dc.typeArticle

Dosyalar